Overview of Icon Samui in Ko Samui, Surat Thani
Icon Samui is a villa and house project, developed by Baansuay Land and House Co., Ltd., located at Bandara Resort And Spa Samui, 4169, Bo Phut, Ko Samui, Surat Thani, 84320 Thailand. Villa and house comprises of 2 buildings and 4 units.
About Icon Samui
Icon Samui is a project located in Bo Phut, Koh Samui and it is scheduled for completion in Dec 2023. It has 6 units and was developed by , who is also behind Baansuay Bophut Phase3, Baansuay Khaolay and Baansuay Bophut phase2.
Available Units
Icon Samui for sale: 4 available units from USD431,483 to USD502,901.
Facilities
Facilities at Icon Samui include security.
Market stats
The average sale price at Icon Samui is USD1,511 per sqm.
This is 24.4 % downtrend current average sale price in Ko Samui (USD1,998 per sqm) and 25.4 % downtrend the average price in Surat Thani (USD2,026 per sqm).
sales prices at Icon Samui are 10.3 % downtrend past year average price.
Payment Plan
Check out the payment plans to purchase a property in Icon Samui. Whether you are interested in investing in a strategic location in Ko Samui or finding your next residence, here you will find the necessary options to facilitate your purchase.
Payment Term Process 2
Reservation deposit
Immediately
฿200,000
1st Installment
Upon contract signing
40.0%
2nd Installment
Sign contract Agreement
10.0%
3rd Installment
Ground Floor Structure Completion, Pool Structure Completion
10.0%
4th Installment
Colum, Roof beam, Roof Structure, Roof Tile Completion
10.0%
5th Installment
Construction of The Wall, Electrical and Sanitation Systems Completion
10.0%
6th Installment
Wall Plastering, Ceiling Work, Tilling Work Completion
10.0%
7th Installment
Installation of Aluminum Door and Windows Completion
5.0%
8th Installment
On handover
5.0%
Payment Term Process 1
Reservation deposit
Immediately
฿200,000
1st Installment
Upon contract signing
20.0%
2nd Installment
Ground Floor Structure Completion, Pool Structure Completion
20.0%
3rd Installment
Colum, Roof beam, Roof Structure, Roof Tile Completion
20.0%
4th Installment
Construction of The Wall, Electrical and Sanitation Systems Completion
10.0%
5th Installment
Wall Plastering, Ceiling Work, Tilling Work Completion
10.0%
6th Installment
Installation of Aluminum Door and Windows Completion
10.0%
7th Installment
On handover
10.0%